Green Star airtightness testing —
ATTMA Level 2, NZ and Australia
ATTMA Level 2 certified airtightness testing for Green Star Buildings submissions — NZ and Australia. Full test plan, on-site testing to AS/NZS ISO 9972:2015 and ATTMA TSL2, and submission-ready documentation including area-weighted results for complex typologies.
Green Star airtightness testing isn't standard blower door testing — the methodology and the credential are different
Green Star Buildings (NZ and Australia) requires airtightness testing of the entire conditioned envelope — not sample units, not representative zones. The test must be carried out by an ATTMA Level 2 accredited tester following ATTMA TSL2 methodology. A Level 1 tester, an uncertified blower door contractor, or a test carried out without a documented Method Statement will not satisfy the Green Star submission requirements.
ATTMA Level 2 accreditation covers large and complex commercial buildings — multi-fan testing for large floor plates, defined protocols for handling service risers, stairwells, plant rooms, and partially conditioned zones. The credential exists because commercial buildings require a substantially different approach from residential testing, and the consequences of a methodology error at submission stage are significant.
The test boundary is rarely straightforward
Commercial buildings combine conditioned zones, unconditioned buffers, service risers, plant rooms with louvred openings, and car parks — none of which are cleanly separated in the design. Defining the test boundary correctly before the test is essential; getting it wrong means invalid results at submission.
Large buildings need multi-fan methodology
Achieving and maintaining 50 Pa across a large floor plate requires multiple fans operating simultaneously. The number of fans, placement, and pressurisation sequence all affect the result. This is ATTMA TSL2 scope — not covered by standard residential testing methodology or equipment.
Sectional testing requires area-weighted results
Where a building can't be tested as a single zone — due to programme, size, or typology — sectional testing is required. Each section is tested separately and results are combined using an area-weighted calculation. This must be documented correctly for the Green Star submission.
Early involvement changes the outcome
The most common cause of a Green Star airtightness problem is not a bad test — it's a building that wasn't designed with a coherent airtightness strategy. Defining the test boundary and identifying problem zones at design stage costs nothing compared to remediation at practical completion.
Full-scope Green Star airtightness service
- Drawing review and envelope boundary analysis
- Zone classification — conditioned, buffer, excluded
- Fan quantity and placement strategy
- Formal Method Statement for Green Star submission
- Early-stage design review available on request
- Multi-fan pressurisation for large floor plates
- TECTITE Express result calculation
- Calibrated equipment — current calibration certificates provided
- Site coordination — pre-test checklist issued in advance
- Leakage identification available where result requires investigation
- Test certificate to AS/NZS ISO 9972:2015 and ATTMA TSL2
- Method Statement — test boundary, fan placement, sealing approach
- Calibration certificates for all equipment used
- Boundary diagrams and site photographs
- Area-weighted result calculation for sectional tests
- Test boundary definition at design stage
- Airtightness target setting aligned with Green Star credit requirements
- Penetration and interface detailing review
- Coordination with energy modelling and HVAC design
- Shakedown test before linings to identify and resolve leakage early
Where commercial airtightness testing gets complicated
Most commercial buildings in NZ and Australia weren't designed with airtightness testing in mind. The common problem zones are predictable — and manageable, if they're identified before test day.
Air permeability targets for Green Star Buildings
Green Star airtightness benchmarks are expressed as air permeability — q50 in m³/(h·m²) of envelope area at 50 Pa. The applicable benchmark depends on building type and ventilation strategy. All results must be calculated using the area-weighted methodology where sectional testing is applied.
| Building type / ventilation strategy | Target q50 | Notes |
|---|---|---|
| Mechanically ventilated offices & commercial | ≤ 2.0 m³/(h·m²) | Most common commercial typology |
| Dwellings with MVHR or mixed-mode ventilation | ≤ 1.0 m³/(h·m²) | Multi-residential with heat recovery |
| Naturally ventilated dwellings | ≤ 5.0 m³/(h·m²) | Less common in Green Star Buildings context |
Benchmarks are indicative — Green Star credit requirements should be confirmed against the current Green Star Buildings technical documentation for your project. Contact us to discuss the applicable benchmark for your building type and credit target.
What the Green Star airtightness commission produces
- Method Statement — test boundary, fan placement, sealing approach, zone classification
- Test certificate to AS/NZS ISO 9972:2015 — measured data, calculated q50, pass/fail
- ATTMA TSL2 compliance documentation
- Equipment calibration certificates — current at time of test
- Boundary diagrams and annotated site photographs
- Area-weighted result calculation where sectional testing was required
- Leakage identification report where investigation was carried out
- Report formatted for Green Star Buildings submission